Stop retyping PDFs into spreadsheets.

Spray recs, fertilizer invoices, lab results, field logs — Styr reads the PDFs and paper you already get and fills out the report the county, the water board and your auditor are waiting on. In the format each one asks for.


  • Spray recs

  • Invoices

  • Lab results

  • Field logs

What lands in your inbox

PDF · 2 PAGES

Page one of a product use report PDF

Highlighted: five of the 24 fields the county asks for. The products, rates and intervals are on page 2.

Pesticide use report

READY FOR CALAGPERMITS

Operator / permitVerde Vista Farms · 2601487
Site ID · block04 · 07214A, 07214B
Commodity codeBROCCOLI 13005-00
Acres treated10.2 of 136 planted
Date · time2026-08-11 · 0001–0040
Application methodGround · MTRS 11-14S-02E-M
Product · EPA reg no.7 products · reg nos. matched
Rate · total applied5 fl oz/A · 0.398 gal
Applicator licenseverified against permit
REI · PHI24 hr · 7 days

24 fields read from 2 pages

1 held for review


What falling behind actually costs.

  • $42k–$145k

    Penalties for one missed nitrogen report

    Four Central Coast growers, one enforcement action.

  • Every 10th

    A use report is due, or your permit is exposed

    County ag commissioner, for last month’s applications.

  • ~200 hrs

    A year of retyping recs, invoices and logs

    Our estimate for a three-ranch operation. Tell us yours.

Penalty figures: Central Coast Water Board enforcement action, November 2023, for failure to submit total nitrogen applied reports.


Take a photo of it. That’s the data entry.

Snap the rec, the invoice, the log sheet on your phone — or forward the PDF the way it arrived. Nothing new for the crew to fill out, and the same records that feed your per-acre cost satisfy the filing.

  • Page two of the use report, listing the products applied

    Page 2 of the same PDF

    Seven products, EPA registration numbers, rates, re-entry and pre-harvest intervals. Every line has to reach the filing.

  • Handwritten fuel log binder

    The binder in the yard

    Fuel and equipment tickets, written by hand at the tank.

  • Ranch manager’s notepad

    The manager’s notepad

    Irrigation hours and fertilizer units, jotted between stops.

  • Handwritten crew task card

    The crew’s task card

    Who worked which block today, in their own shorthand.

  • Spray recs and use reports

    PCA recommendations and the use reports that come back as PDFs — read field by field, page 1 and page 2.

  • Fertilizer and amendment invoices

    Product, tons, analysis. Converted to pounds of N per acre on the block that got it.

  • Irrigation water lab results

    Nitrate as N from each well and source, weighted across the acre-inches actually applied.

  • Handwritten field logs

    Irrigation hours, tractor passes, tank mixes — the notepad and task card, in the crew’s own shorthand.

  • Harvest tags and cooler tickets

    Lot, block, date, crew. The trace record your auditor asks for, and the yield the nitrogen math needs.

  • Crew timesheets

    Hours by crew and block — one read that feeds payroll and your per-acre labor cost at the same time.


Seven records, in the format each one is asked for.

  • Pesticide use report

    Monthly, by the 10th

    CalAgPermits upload

    County agricultural commissioner

  • Notice of intent

    24 hr before use

    NOI form

    County ag commissioner

  • Total nitrogen applied / INMP

    Annually, March 1

    GeoTracker template

    Central Coast Water Board

  • Annual compliance form

    Annually, March 1

    eNOI / ACF

    Central Coast Water Board

  • Irrigation water results

    Per sample event

    Lab summary, CSV

    Water board + your file

  • Harvest and sanitation log

    Per lot, on request

    Audit binder, PDF

    Your GFSI auditor

  • Crew hours by block

    Weekly

    Payroll CSV

    Payroll + cost ledger


Irrigation pipe yard

Nitrogen adds itself up all season, not in February.

Applied minus removed, per ranch, per crop — including the nitrogen in your irrigation water. When the INMP summary report is due, the number is already there.

Applied (A) — lb N/ac

Synthetic fertilizer

148

Organic fertilizer

14

Irrigation water

31

Compost

9

A total

202

Removed (R) — lb N/ac

Harvested crop

96

Cover crop scavenged

18

Sequestered

0

Treated / other

0

R total

114

A − R

88

lb N/ac · crop year to date


East Basin Ranch · broccoli · 136 ac

GW Phase Area 2 · INMP summary report

Due March 1 · GeoTracker

Well 2 lab report read July 9 — 38 mg/L nitrate as N, weighted across 8.1 ac-in applied, becomes the 31 lb N/ac in the applied column. No one converts it by hand.


Styr holds anything it can’t stand behind.

Last month 94% of records posted on their own. These are the ones that came to a person, with the page they came from attached.

  • HELD

    Rate illegible on line 4

    Could read 1.5 pt/A or 1.5 qt/A. Nothing posts until your PCA says which.

    use report · page 2 · 08-11

  • HELD

    Block not on the permit

    Block 07214B isn’t listed under site 04 on permit 2601487. Either the permit or the record is wrong.

    use report · page 1

  • HELD

    Water sample out of date

    Well 2 was last sampled 16 months ago. Resample before the nitrogen total is filed.

    lab report · well 2

Styr prepares the record. You and your PCA still review and sign it — and every field traces back to the page it was read from.


Broccoli field in the Salinas Valley

Bring us one month of paperwork.

We’ll read a month of your spray recs, fertilizer invoices and field logs and hand back the filings — before you sign anything.

Book a farm visit